Mechanical weighbridges upgrade

The system is designed for the modernization of Balance Sibiu semi-automatic rocker bridges, type concrete beams with a length of 15m and maximum capacity of 50t with 20kg division. It is understood that any manufacturer of weighing systems can approach such works, ie there is no exclusive license for the modernization of old mechanical bridges, manufactured at that time by a single manufacturer. This is perfectly logical, considering that only the tank, the beams and possibly the concrete slabs are reused from the old scale, if they are suitable for road traffic. All old measuring elements (levers, knives, cushions, etc.) are dismantled and dismantled.

The works are carried out in the following order:
  • the tank is completely released by removing the metal construction of the rocker bridge
  • The support foundations of the old mechanical weighing mechanism remain in the tub
  • as the support points of the new electronic bridge differ from the mechanical one (especially the elevation of the new support points being about 280mm below the beam “I” of the metal construction of the bridge), it is necessary to pour in each corner a weakly reinforced concrete block that will include the existing foundation. In the middle of the tank, a weakly reinforced concrete block will be poured on either side between the 2 existing foundations.
  • FLINTAB delivers weighing cell assembly kits that are welded directly to the rocker bridge's "I" resistance beams
  • all the mechanisms of the old bridge are no longer used (levers, moving arms, knives, indicator head)
  • All welding and assembly operations of weighing cell assembly kits, including reinstallation of the entire construction in the tank, are performed only under technical assistance of the supplier.

SYSTEM CONFIGURATION

The purpose of the product is to determine the mass in commercial transactions and is covered by Directive 2009/23 / EC. (repealing Directive 90/384 / EEC), transposed by H.G. 617/2003 for establishing the introduction conditions on the market and commissioning of weighing machines with non-automatic operation, republished, modified by H.G. 1302/2009. The only relevant way to use a road scale is to manage it easily and effectively weigh the data and allow it to be transferred to various other networked software applications.

Foundation

  • Project for infrastructure works and installation preparation
  • Weighing cell mounting kits

PITON weighing platform - Electronic components

  • KELI weighing cells type ZSFY-SS-30t-C3 with surge protection
  • Junction box with surge protection
  • Copper connection cable for buried, shielded and reinforced mounting (20..30m)
  • BX1 digital weighing indicator in stainless steel housing
  • HP laserjet Pro P1102 USB A4 Black and White Printer
  • APC surge protection socket, transient voltage <15%, filtering EMI / RFI> 20-30db, absorbed power 903 joules, peak current 13KA
  • PC station (average market configuration) with operating system and all preinstalled applications, including antivirus program
  • Business transaction management software as required by H.G. 1373/2008

Services

  • Assembly and installation
  • Laboratory insurance metrological checks (truck + crane + semi-trailer with standard weights) and test personnel (verifying inspector, driver / crane operator / load binder)
  • Initial metrological verification and legal markup
  • Train Operators
  • Declaration of Conformity and Certificate of Testing
  • Preventive Maintenance Manual

Exclusions from standard or optional supplies

  • Construction works: concrete, grounding, welding (4h), cable laying
  • Transport platform from its own factory (Tecuci branch, Galati county)
  • 16t crane for unloading and mounting platform on position (3..4h)

Warranty

  • 1 year

Post-warranty service

  • Throughout the life of the product: spare parts insurance, service interventions, service contracts, periodic metrological checks or after repair / relocation

Delivery time

  • From current stock, mass-produced model

Options

  • Increasing the maximum capacity to 60 tons.

CONSTRUCTIVE VARIANT

PITON

The offer is designed for modernization of weighbridges with semi-automatic manufacturing head Libra Sibiu - type of transversal concrete beams with a length of 15m and a maximum capacity of 50 tons.

PITON PI

The offer is designed for modernization of weighbridges with semi-automatic manufacturing head Libra Sibiu - type 4 beams longitudinal, known as the name of PI beams, with length of 15m and the maximum capacity of 50 tons.

PITON M

The offer is designed for modernization of weighbridges with semi-automatic manufacturing head Libra Sibiu - metal construction, with a length of 15m and a maximum capacity of 50 tons.

PHOTOS

This website uses cookies. By continuing navigation means your accept. Read more...